设为荣鼎娱乐 设为收藏

联系方式

 

洛阳松导感应加热科技荣鼎娱乐 

联系方式:15038554363  

24小时技术热线:15038554363

电 话:0379—60125771

邮 箱:1390003299@qq.com

厂址:河南省洛阳市洛新工业园区

  • 产品
  • 0.25T并联中频炉

    0.5T中频炉

    0.5T并联中频炉

    0.5T串联中频炉

    0.5T 中频熔炉

    0.25T中频熔炉

    1T中频熔炉

    2T中频熔炉

    5T中频熔炉

    中频熔炉

    中频感应炉

    250kg中频感应炉

    500kg中频感应炉

    1T中频感应炉

    2T中频感应炉

    5T中频感应炉

    3T中频感应炉

    400kW全自动中频感应加热炉

    棒料,圆钢中频感应加热设备

    中频钨钼烧结炉

    中频感应烧结炉

    钼丝钼块烧结炉

    钢管感应加热炉

    钢管感应加热炉

    Φ120mm圆钢感应加热炉

    350kW铝圆棒自动加热生产线

    Φ65mm圆钢中频锻造炉

    300KW中频感应加热设备

    电炉行业动态新闻
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

    Melting furnace inspection steps before leaving the factory

     1。 In order to verify the quality of the contract equipment and related equipment during the production period, the tenderee has the right to send the person to the factory where the winning bidder is located for inspection。 For the transportation expenses at the location of the winning bidder and for the quality inspection requirements of the bidder, such as necessary safety equipment, office supplies, technical documents and drawings, accounting data, manufacturing and inspection standards and other necessary inspection data shall be free of charge by the winning bidder。 provide。

    2. The written materials formed by all the supervisors and quality inspection activities of the tenderer during the manufacturing period shall not be used as the quality certification documents of the successful bidder. Before the delivery, the quality inspection of the tenderer shall not remove the responsibility of the contract within the scope of the supplier's quality guarantee period, nor shall it replace the quality inspection of the equipment at the tenderee's site.

    3 . In the mid-inspection, the issues discovered or raised by members of the quality inspection team shall be resolved through friendly consultations.

    4. The equipment must be tested in the overall joint test before leaving the factory. The time for the inspection of the tenderee shall be determined according to the trial operation time. The joint trial operation shall be carried out under the supervision of the inspector of the tenderee.

    5. If there is a problem in the assembly test after the equipment arrives at the bidder's site, the reason is that the winning bidder did not perform the overall joint commissioning of the equipment before leaving the factory, so the delay time will be calculated according to the delayed delivery date.

     http://www。firstfurnace。com/BdwlkjNews。asp?id=1408


    Copyright© 2007-2013洛阳松导感应加热科技荣鼎娱乐 All Rights Reserved 
    电 话:0379—60125771 手 机:15038554363
    网站正在制作中,随时修改,非正式运行。
    本站关键词:中频炉、中频电炉、熔炼炉
    王者彩票APP 澳洲幸运8 荣鼎娱乐 北京赛车怎么玩 北京赛车pk10玩法 山东11选5走势 澳洲幸运10开奖结果 内蒙古11选5 重庆龙虎微信群 99彩票导航网

    王者彩票APP 澳洲幸运8 荣鼎娱乐 北京赛车怎么玩 北京赛车pk10玩法 山东11选5走势 澳洲幸运10开奖结果 内蒙古11选5 重庆龙虎微信群 99彩票导航网